Q.Disaster preparedness is the first step in any disaster management process. Explain how hazard zonation mapping will help disaster mitigation in the case of landslides.
How to approach: Break the explanation into logical causal factors, illustrate with a diagram/flowchart or map where relevant, and link to contemporary relevance.
Practice & AI Tools for This Question
Wrote an answer to this PYQ? Check it with Acme AI in 3 mins or generate custom mind maps.
Matched Topper Handwritten Answer Copies (3)
Open in 3D PYQ RealmIn the Disaster Management Cycle (Prevention -> Mitigation -> Preparedness -> Response -> Recovery), Disaster Preparedness and Risk Identification form the foundational first step, transforming disaster management from reactive post-tragedy relief to proactive life-saving prevention (DM Act, 2005 & Sendai Framework). With ~12.6% of India’s land area (0.42 million sq km) across 18 states/UTs — spanning the Himalayas, North-Eastern hills, Western Ghats and Nilgiris — prone to landslides, Landslide Hazard Zonation (LHZ) Mapping is the primary scientific tool for landslide mitigation.
✏️ Fig: Mountain slope cross-section showing Landslide Hazard Zonation (LHZ) mapping into High/Red, Moderate/Yellow and Low/Green zones
1. What is Landslide Hazard Zonation (LHZ) Mapping?
- Scientific Multi-Parameter Spatial Mapping: Conducted primarily by the Geological Survey of India (GSI) (under the National Landslide Susceptibility Mapping [NLSM] programme at 1:50,000 macro-scale and 1:10,000/1:5,000 meso/micro-scale) along with NRSC-ISRO.
- Parameters Integrated via GIS & Remote Sensing: Combines intrinsic geological factors (lithology/rock type, slope angle & aspect, fault/thrust proximity, soil depth, hydrogeology, land use/land cover) with extrinsic triggering factors (monsoon cloudburst intensity, seismic zone activity, anthropogenic road-cutting) to classify terrain into Severe/Very High, High, Moderate, Low and Very Low Hazard Zones.
2. How LHZ Mapping Directly Aids Landslide Disaster Mitigation
- 1. Risk-Informed Land-Use Zoning & Building Regulations (Non-Structural Mitigation):
- Very High / Severe Hazard Zones (Red Zones): Enforces a strict prohibition on new human settlements, multi-storey hotels, large hydro-reservoirs and rock-blasting, while prioritising relocation of vulnerable hamlets and vetiver/bamboo bio-engineering afforestation.
- Moderate Hazard Zones (Yellow Zones): Permits regulated, lightweight construction subject to mandatory geotechnical soil testing, slope-toe protection and building codes.
- Low Hazard Zones (Green Zones): Identifies safe zones for locating schools, hospitals, relief shelters, helipads and town extensions.
- 2. Safe Alignment & Engineering of Linear Infrastructure (Roads, Railways, Tunnels):
- Guides agencies like BRO, NHAI and Indian Railways (e.g., Char Dham Pariyojana, USBRL Kashmir rail link, Konkan Railway) to bypass active slip zones or pre-design structural mitigation — such as gabion retaining walls, rock bolting, shotcreting, soil nailing, avalanche/rockfall nets and subsurface horizontal drainage pipes.
- 3. Targeted Deployment of Early Warning Systems (EWS):
- Since instrumenting every hill slope is cost-prohibitive, micro-scale LHZ maps pinpoint exact unstable scarps for installing MEMS tilt-meters, piezometers, rain-gauges and InSAR satellite monitoring (e.g., LANDSLIP / GSI-British Geological Survey EWS pilots in Darjeeling and Nilgiris).
- 4. Pre-Positioning of Emergency Response & Evacuation Planning:
- Identifies choke points on mountain highways likely to be blocked during monsoons, enabling NDRF/SDRF to pre-position earthmovers, Bailey bridges, medical caches and community evacuation routes.
- 5. Environmental & Watershed Protection:
- Highlights degraded upper catchments requiring jhum (shifting cultivation) control, check-dam drainage and natural spring (Dhara) rejuvenation.
Way Forward / Conclusion
Implementing the NDMA National Landslide Risk Management Strategy (2019) — by scaling 1:10,000 micro-zonation for all 18 landslide-prone states, legally binding municipal master plans to GSI’s Bhukosh NLSM portal, and training local Aapda Mitra volunteers — will substantially mitigate landslide mortality and infrastructure losses.
Value Addition
- National Nodal Agency: Geological Survey of India (GSI) is the designated nodal agency for landslide studies in India, operating the National Landslide Susceptibility Mapping (NLSM) and the National Landslide Forecasting Centre (NLFC).
Question Specifications, Marking Rubric & Syllabus Mapping
| Examination & Year | UPSC Civil Services Mains Examination 2019 (Question 18) |
|---|---|
| Paper & Syllabus Topic | General Studies Paper III — Economy, Environment, S&T & Security → Disaster Management & Resilience |
| Marks, Word Limit & Ideal Time | 15 Marks • 250 Words • Ideal Writing Time: 11–12 Minutes |
| Directive Word & Core Demand | Explain: Clarify the underlying causes, mechanisms, and significance of the phenomenon in plain, structured terms. |
| Recommended Structure Split | Intro: ~30–35 Words • Body: ~175 Words (4–5 sub-headings + diagram/data) • Way Forward: ~35–40 Words |
| AI Practice & Evaluation Tools | Upload Handwritten Answer for 3-Min Acme AI Evaluation | Generate Custom Answer & Mind Map |
Related & Repeated UPSC Mains PYQs (6)
Past UPSC Mains questions connected to this node in the 3D PYQ Realm knowledge graph.
How important are vulnerability and risk assessment for pre-disaster management. As an administrator, what are key areas that you would focus in a disaster management
Drought has been recognized as a disaster in view of its spatial expanse, temporal duration, slow onset and lasting effects on vulnerable sections. With a focus on the September 2010 guidelines from the National Disaster Management Authority (NDMA), discuss the mechanisms for preparedness to deal with likely El Nino and La Nina fallouts in India.
The frequency of earthquakes appears to have increased in the Indian subcontinent. However, India’s preparedness for mitigating their impact has significant gaps. Discuss various aspects.
“The Himalayas are highly prone to landslides.” Discuss the causes and suggest suitable measures of mitigation.
With reference to National Disaster Management Authority (NDMA) guidelines, discuss the measures to be adopted to mitigate the impact of recent incidents of cloudbursts in many places of Uttarakhand.
On December 2004, tsunami brought havoc in 14 countries including India. Discuss the factors responsible for the occurrence of Tsunami and its effects on life and economy. In the light of guidelines of NDMA (2010) describe the mechanisms for preparedness to reduce the risk during such events.
More UPSC Mains PYQs on Disaster Management (GS3)
Build comprehensive topical mastery across Disaster Management & Resilience by practicing these related UPSC Mains questions.
Discuss how the contradiction between ‘rapid infrastructure development’ and ‘disaster-risk reduction’ in ecologically-sensitive areas of India can be managed, with suitable examples.
“Community participation is the cornerstone of effective disaster management”. Analyse this statement with suitable examples from India. Also discuss the challenges to community participation and measures to strengthen it.
Seawater intrusion in the coastal aquifers is a major concern in India. What are the causes of seawater intrusion and the remedial measures to combat this hazard?
What is disaster resilience? How is it determined? Describe various elements of a resilience framework. Also mention the global targets of Sendai Framework for Disaster Risk Reduction (2015–2030).
Flooding in urban areas is an emerging climate-induced disaster. Discuss the causes of this disaster. Mention the features of two such major floods in the last two decades in India. Describe the policies and frameworks in India that aim at tackling such floods.
Dam failures are always catastrophic, especially on the downstream side, resulting in a colossal loss of life and property. Analyze the various causes of dam failures. Give two examples of large dam failures.
Frequently Asked Questions — UPSC Mains 2019 GS3 (Disaster Management)
How should I structure the answer for this UPSC Mains 2019 GS Paper III question on Disaster Management?
This 2019 GS Paper III question carries 15 marks with a 250-word limit and uses the "Explain" directive. Break the explanation into logical causal factors, illustrate with a diagram/flowchart or map where relevant, and link to contemporary relevance. Follow the ideal word split (Intro: ~30–35 Words • Body: ~175 Words (4–5 sub-headings + diagram/data) • Way Forward: ~35–40 Words) and aim to finish within 11–12 Minutes.
Which UPSC Mains syllabus topic does this 2019 question belong to?
This question is part of General Studies Paper III — Economy, Environment, S&T & Security under the syllabus module "Disaster Management & Resilience". You can explore all repeated questions from Disaster Management in Acme AI's 3D PYQ Realm or filter all Disaster Management PYQs on the Mains PYQ Directory.
How can I get my handwritten answer to this 2019 GS3 PYQ evaluated by AI?
Write your answer on standard UPSC margin sheets, scan it as a PDF or image, and click "Evaluate My Answer (AI)" on this page to open Acme AI's Spatial Red-Pen AI evaluator (/upsc-answer-evaluation?subject=GS3). It evaluates your structure, directive alignment, diagrams/maps, and handwriting presentation in under 3 minutes with 99% human-examiner accuracy (20 free credits on signup).
Can I generate a custom mind map or Hindi model answer for this question?
Yes. Click "Generate Answer & Mind Map" on this page to open Acme AI's Answer Generator (/gen-ans) with this exact 2019 GS3 question pre-filled. You can generate custom topper-grade answers with embedded visual flowcharts and mind maps in either English or Hindi.
AI-Powered Mains Mastery Suite
Turn Passive PYQ Reading into Active Answer Writing
Evaluate your handwritten UPSC Mains answers in 3 minutes with Acme AI or generate custom model answers with mind maps.
AI UPSC Mains Answer Evaluation
Practice writing any PYQ on paper and upload your handwritten scan (PDF or image) for instant, rubric-aligned UPSC examiner feedback.
- Direct Image AI (Not Flat OCR): Evaluates your handwritten diagrams, maps, flowcharts, and spatial presentation
- 99% Human-Examiner Accuracy: Pinpoints missing dimensions, directive-word drift, and value-addition opportunities
- All Papers & 18 Optionals: Covers GS 1–4, Essay, Anthropology, PSIR, Sociology, Geography, History & more in English & Hindi
- Annotated Copy + Topper Benchmark: Visual margin ticks, remarks, and matched topper copy comparisons
AI UPSC Answer Generator & Mind Maps
Generate topper-grade model answers for any UPSC PYQ, current affairs editorial, or mock question—complete with visual mind maps and flowcharts.
- Embedded Mind Maps & Flowcharts: Automatically builds visual diagrams you can replicate in the exam hall for +1.5 extra marks
- Strict Directive & Word Discipline: Calibrated for 150-word (10M), 250-word (15M), and 1000-word Essay structures
- Committee, SC & Data Citations: Enriches body paragraphs with 2nd ARC, NITI Aayog, Constitutional Articles, and SDG hooks
- Auto-Matched Topper Copies & PYQs: Every generated answer links to similar past UPSC questions and ranker scripts
Join the Acme Mains Program (AMP 2027 — 45 Tests) or 1-on-1 Personal Mentorship with Avinash Sir.