Correct Answer: Option (A) — 1 only
Concept & Option Breakdown
Standard Reference VerifiedStatement 1 is correct: PSLV is primarily designed to deliver Earth-observation and remote-sensing satellites into Sun-Synchronous Polar Orbits (SSO), while GSLV is designed to lift heavier payloads (such as communication satellites) into Geostationary Transfer Orbit (GTO).
Statement 2 is incorrect: Geostationary satellites (which appear fixed in the sky relative to an observer) are placed in circular geostationary orbit (~35,786 km), predominantly using GSLV. PSLV satellites typically operate in low-Earth polar orbits and move across the sky.
Statement 3 is incorrect: GSLV Mk III (LVM3) is a three-stage launch vehicle consisting of two S200 solid strap-on boosters (Stage 1), an L110 liquid-fueled core (Stage 2), and a C25 cryogenic upper stage (Stage 3). It is not a four-stage vehicle.
Satellites that appear fixed in the sky are in geostationary orbits launched by GSLV, not polar orbits by PSLV. Additionally, PSLV is four-stage, while GSLV Mk III is three-stage.